Analisis Percepatan Waktu Dan Biaya Proyek Konstruksi Dengan Penambahan Jam Kerja (Lembur) Menggunakan Metode Time Cost Trade Off
DOI:
https://doi.org/10.59188/jcs.v2i7.423Keywords:
biaya, kerja tambahan (lembur), biaya waktu perdaganganAbstract
Proyek konstruksi seringkali dihadapkan pada berbagai kendala dalam proses pelaksanaannya. Masalah-masalah tersebut dapat menyebabkan gangguan atau keterlambatan penyelesaian proyek. Analisis ini bertujuan untuk meminimalisir keterlambatan penyelesaian proyek sehingga dapat diselesaikan tepat waktu. Analisis ini menggunakan metode team cost trade dengan penambahan jam kerja (lembur). Hasil analisis ini menunjukkan bahwa lembur 1 jam efektif karena memiliki durasi 145 hari dan total biaya yang cukup murah. Sehingga penambahan jam kerja dapat diterapkan pada proyek untuk meningkatkan percepatan pengerjaan proyek.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Shandy Dava Werdana, Budi Priyanto
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International (CC-BY-SA). that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.