[1]
Dava Werdana, S. and Priyanto, B. 2023. Analisis Percepatan Waktu Dan Biaya Proyek Konstruksi Dengan Penambahan Jam Kerja (Lembur) Menggunakan Metode Time Cost Trade Off . Journal of Comprehensive Science (JCS). 2, 7 (Jul. 2023), 1976–1980. DOI:https://doi.org/10.59188/jcs.v2i7.423.